The 230-kV line will run from Waterford to Vacherie substations. The project will help meet future load growth and reliability needs for 1.3 million Entergy customers served in the region.
Sycamore to Peñasquitos 230-kV Transmission Line San Diego Best Project Owner: San Diego Gas & Electric Lead Design Firm: NV5 Construction Manager: Burns and McDonnell General Contractor: ARB Inc.
With a design in place, Barnard crews installed tandem single-circuit shoofly lines, composed of eight H-structures per circuit, spanning 7,500 linear ft.
National Energy Systems Co. proposed a new international 230 kv transmission line that will connect its proposed 660 Mw gas-fired power plant in Washington to the western power grid via Canada.